1. Value of AS series intelligent physical layer management system
Equipment topology and equipment monitoring
Topological visual management
Powerful equipment management capabilities
Remote management
Comprehensive application service management

2.1 Solving solution ---- Types of management techniques
Port type management techniques
Principle: Insert a sensor device in the wiring frame port, which can sense the insertion and pull-out of the jumper.
Advantages: low cost, intelligent realization of most functions, simple structure, no need for intelligent jumper, no need for device-side mapping distribution frame
limitations: the corresponding relationship cannot be automatically identified, it can only jump at the end of the electronic distribution frame, and it is best not to jump in the case of power failure.
Link type management techniques
Principle: Insert judgment circuit contacts in the two wiring frame ports, and judge
Advantages:Using a special intelligent jumper connection: it can realize all the functions of the electronic distribution frame, can detect the corresponding relationship, regardless of power on or off, it can jump to the
Risk: the price is higher than the port type, the electronic distribution frame needs to be used in pairs, and must rely on 9-core intelligent jumper.
Port and link compatible type

Principle: Integrated port-type and pure-link technology, that is, implanting an induction device in the port, and implanting a link judgment circuit
Without risk: perfect electronic wiring frame system solution, realizing all functions of the electronic wiring frame system, good real-time,
2.2. Solution - The solution of the new wiring system is exactly the same as the installation of the traditional wiring frame. It can be debugged after the completion of this wiring project.
The undebugged electronic distribution frame system does not affect the operation of the entire network system.

2.3. Solution - Upgrade and Transformation of Old Cabling System
No matter which manufacturer's wiring system you originally used, Schneider? Comp?
Panda? Simon?
Anpu? We can upgrade your traditional wiring system to the electronic wiring frame system,
so that you can enjoy the application results of the Internet of Things in the field of
integrated wiring without re-cabling, re-playing modules, or even disconnection. We
guarantee that it will not affect your business Install the induction bar on the wiring rack,
and connect the induction bar to the scanner on the rest day. Debugging can be carried out
during working hours, but it does not affect your network operation port system does not
need a special jumper. Use your original ordinary jumper.

Old cabling system upgrade plan 2: replacement
We only need to replace your original distribution frame with our multimedia electronic distribution frame to debug it. It can be carried out during working hours without affecting the working port management without special jumpers.
The third upgrade plan of the old wiring system: plug-in
Inserting an electronic distribution frame between the original distribution frame and the switch for debugging can be carried out during working hours without affecting the working terminal.