Home
Product Service
Solution
About us
News center
Project cases Technical Support
Home
Tmall Mall
Jingdong Mall
Product Service
SCS WEAK CURRENT WIRE
RVV PROTECTOR WIRE
RVVP PROTECTOR WIRE
RVS PROTECTOR WIRE
RVVS PROTECTOR WIRE
RVVSP PROTECTOR WIRE
RYWV PROTECTOR WIRE
SMART CABLING SYSTEM
SMART MANAGEMENT SYSTEM
ELECTRONIC PATCH PANEL
SCS OCTAGONAL POLE
MONITORING POLE SERIES
OCTAGONAL POLE SERIES
ROAD LIGHTING POLE SERIES
WATERPROOF TANK SERIES
Solution
About us
News center
Project cases
Technical Support
What is Engineer Cabling? The Main Point Of Intergrated Cabling Construction Project

Announcer: Guangdong Aucas Network Technology Co Ltd    /     2021-09-22   /     852   /  

Firstly. what is engineer cabling?

Engineer cabling, also known as structured  or intelligent engineer cabling, refers to the data transmission system, voice communication system, cable TV system, background music system, security monitoring system, intelligent card system, etc. In general, wiring engineering includes work area subsystem, horizontal wiring subsystem, vertical wiring subsystem, management subsystem, building group subsystem and equipment subsystem and other subsystems.

Engineer cabling
has international norms and basis to follow, it must be an open, at the same time have a high level of compatibility and integrity. In the field of construction, engineer cabling belongs to a sub-project of building intelligence (also known as intelligent weak current) project.

Engineer cabling



Secondly. The main point of intergrated cabling construction project

The implementation design of integrated cabling project plays a decisive role in the whole process of cabling, and the design institution of project implementation should be careful. Here are a few things to keep in mind:

1, in the integrated wiring structure design is reasonable, to ensure the appropriate cable bending radius. When going around other cable troughs, the turning slope should be gentle. Pay attention to whether the cables at both ends can be covered without damaging the cables after sagging.

2, pay-off process is mainly to pay attention to the control of tension, for the cable with reel packaging, it is recommended to arrange at least one worker at each end, the reel set on the qualified rod, pay-off end workers first from the reel box pre-pull a part of the cable, for collaborators in the other end of the pipeline extraction, pre-pulled out of the line can not be too much, to avoid multiple lines on the site entanglement around.

3. After the end of the cable drawing process, the redundant cables flowing out of both ends should be sorted and protected. When winding the wire, it should follow the original rotation direction, and the coil diameter should not be too small. If possible, use the waste wire tip to specify it on the bridge, suspended ceiling or carton, and make a mark to remind other personnel not to step on it.

4. When arranging, bundling, and placing cables, do not make redundant cables too long, do not superimpose forces on cables, consolidate coils accordingly, and do not tighten the fixed cable.

5. During the entire construction period, the process shall be reported in time, the person in charge of each type of work shall communicate with each other, notify Party A immediately if any problem is found, and complete the task of this type of work in time before the start of other subsequent types of work.

6. If the unshielded twisted-pair cables are installed and the grounding requirements are not high, ground the cables through the main slot connected to the cabinet.

7, the specifications of the groove are determined in this way: the cross-sectional area of the groove is left 40% of the surplus for expansion, and the cross-sectional area of more than 5 types of twisted pair is 0, 3 square centimeters. When installing the cable trough, pay attention to the isolation from the strong wire trough. The wiring system should avoid parallel walking of more than 3 meters with the strong current line in the case of wireless shielding and the distance is less than 20cm. If the fault cannot be avoided, the cable trough must be shielded and isolated. The cable pipe entering the home is lowered to the ground along the partition wall from the nearest ceiling cable trough, and the buried pipe is boring from the ground to the home isolation.

a) : The pipe groove transition and interface should not have burrs, and the wire groove transition should be smooth.

b) : More than two elbows of the wire tube must be left in the branch box.

c) : The wall bottom box should be installed more than 30 cm from the ground, and maintain equal height and parallel with other places.

d) : The wire pipe is galvanized thin wall steel pipe or PVC.

The integrated wiring system should be considered comprehensively. Since most of the wiring is done by workers who have professional wiring certificates, most failures can be avoided. However, when laying lines, we still need to check the technology, only if we notice these common problems mentioned above can we really do "less money, more work, do good things, not bad things" in structured wiring.

Okas Technology is a high-tech enterprise integrating the independent development, design, production and sales of copper cable wiring, optical cable wiring, intelligent electronic wiring frame solution, data center MTP/MPO high-density solution, data center cold channel solution, eight kinds of copper cable solutions, security cable and intelligent management wiring system platform. The company is oriented to the pursuit of user needs, and provides customers with attractive products of Orcaster. Orcas wiring four colors convenient!